New control room

New control room

Tasbulk were engaged by a local contractor to supply a new control room to be located at the Dunalley Canal bridge.

A few back and forth designs were exchanged and it was decided that a 4.8 x 2.4m office with a small kitchenette facility would be the ideal solution.

The building was manufactured from scratch at our Brighton depot and completed within the matter of a few weeks. Once complete, Tasbulk engaged another Tasmanian owned business to transport and crane the building into position where it still sits today.